Not only did this add unexpected expenses, but the plan also didn't fix the uncertainty of whether the unusual roof design, with shell-shaped panels topped by ceramic tiles, would work. The Sydney Opera House is one of the best-known iconic buildings, recognized around the world as a global symbol of Australia.

To stabilize the structure, concrete and steel were inserted into the earth. The slab is surfaced with 6 by 4 foot panels of artificial granite with open joints between them to carry away rainwater. Rather than containing Hawkesbury sandstone like the land that touched it, the peninsula contained random alluvial deposits filled with seawater, a substance that couldn't sustain the planned building's weight.
#SYDNEY OPERA HOUSE CONSTRUCTION FULL#
It involved at least 10,000 construction workers, and took 14 years full of challenges to build the Sydney Opera House. Construction work that originally began in 1959, was eventually completed in 1973. It was designed by Danish architect Jorn Utzon. The Sydney Opera House is a famous arts center. The erection of the opera house faced problems from the start, according to Sydney Opera House's Our Story. The initial survey of Bennelong Point's geology was incorrect. Construction work went on until 1973 under the supervision of new architects and supervisors. Sydney, Australia - December 22, 2011: Sydney Opera House view. Utzon became so pressured by the project, however, that he left Australia during its construction, and never saw the finished building in-person. The choice was the result of an international design contest that drew more than 223 entries from 28 countries in 1957.

The architect chosen for the project was the then-38-year-old Jørn Utzon of Denmark. Designed by the renowned Danish architect Jrn Utzon, its construction started in 1959 and it was formally inaugurated in 1973. This is the case of Jrn Utzon and the design of roof shells of the Sydney Opera House, in which the search for natural references was constant, from the.

The elaborate structures and often unique forms of Utzons design led to many serious issues. Slated to last for four years, the erection of the opera house started in 1959 and took 14 years and 10,000 construction workers to complete, according to the Sydney Opera House website. Model of Major Hall ceiling form in the motif of breaking waves, detail (1964/1965) by Max Dupain Sydney Opera House.